Honeywell HON R100NG Series User And Maintenance Manual page 71

Gas pressure regulator with pilot
Table of Contents

Advertisement

User manual for HON R100 gas pressure regulator with HON P095NG pilot 
Figure 
Step 
Description 
25 
Turn the housing over. Replace the O‐ring 
(1) with a new, greased O‐ring. 
26 
Put the upstream pressure stage housing 
back on the second pressure stage's 
housing. Make sure that the diaphragm 
unit does not fall out! Tighten the screws 
(1), including the washers, in a criss‐cross 
sequence. Observe the tightening torque 
information provided in the table before 
this section. 
27 
Replace the stabilizer seat with a new one. 
Unscrew the nut (1). 
28 
Insert new, greased O‐rings (1, 2). Screw 
the nut back on. 
29 
Screw the stabilizer seat (1) back into the 
housing. 
 
Maintenance 
71 

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hon p095ng seriesHon r100ngHon r100ng-foHon p095ng-mpHon p095ng-hp

Table of Contents