Checklist In The Walk-Through Mode - Dräger Atlan A300 Instructions For Use Manual

Hide thumbs Also See for Atlan A300:
Table of Contents

Advertisement

Tests
8.4

Checklist in the walk-through mode

This section describes how the checklist is processed, using as an example a
device with an electronically controlled gas mixer, active AGS, O
factory defaults.
The scope of the checklist and the test steps displayed may vary due to differing
system settings.
The instructions on the screen take precedence.
Prerequisites
1. Connect the hoses (1).
2. Seal the Y-piece (2).
3. Set the APL valve to 30.
4. Close the flow control valve.
136
2
1
30
20
|
Instructions for use
Atlan A300, A300 XL, A350, A350 XL SW 1.0n
40
sensor, and
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Atlan a300 xlAtlan a350Atlan a350 xl

Table of Contents