Checking The Operational Readiness - Dräger Atlan A300 Instructions For Use Manual

Hide thumbs Also See for Atlan A300:
Table of Contents

Advertisement

For further information about the configuration, see page 166.
6.4

Checking the operational readiness

Using colors, the Standby page (1) indicates whether the system test was
successful and the device is ready for operation.
5
Color
Green
Yellow
Red
If the device is not fully operational, the most important irregularities (5) are
displayed along with a recommendation to perform a specific test (3).
Additionally, the current system leakage is displayed in area (5).
To view details regarding the status of the device, touch the Details... button (2) or
the Tests... button (4), see page 126.
Dräger recommends performing the system test every 24 hours. Otherwise, it will
not be possible to ensure that the device is functional.
|
Instructions for use
Atlan A300, A300 XL, A350, A350 XL SW 1.0n
1
Meaning
System is fully operational.
System is operational with limitations.
There are functional restrictions.
Take further measures to ensure patient safety (e.g., external
monitoring).
System is not operational.
Contact service personnel if necessary.
Getting started
2
3
4
87

Advertisement

Table of Contents
loading

This manual is also suitable for:

Atlan a300 xlAtlan a350Atlan a350 xl

Table of Contents