Job Cycle Timing Diagram - Graco E-Flo iQ Operation Manual

Dispense system
Table of Contents

Advertisement

Job Cycle Timing Diagram

Timing recommendations:
Use discrete signals when possible, especially for the Go signal. Use optional I/O Cable 122029 for discrete
signals.
Use a 50 ms delay between bits.
Automation Control Ready in the following diagram represents:
Pump is active
No active alarms
ADM is in Remote mode
Job Cycle Timing Diagram
Automation Inputs (E-Flo iQ Outputs)
Heart Beat (1Hz)
Automation Control Ready
System Active
+PLC Lockout/Control Active
System Ready to Dispense
Dispense In Process
Automation Outputs (E-Flo iQ Inputs)
* Enable System/Remote Start Request
^System Disable Request
* + PLC Lockout/Control
+ Style Number (integer)
Function
Sequence Description
1
2
Pre-Job Cycle
3
4
333587B
Pre Job Cycle
Pre-charge/De-charge
Notes:
* Can be enabled at the same time.
+ Can only be used through the fieldbus; and must be used to operate the system.
‡ The dispense complete is optional. This bit summates the volume dispensed any time it is triggered. Dropping the style strobe will also summate the volume dispensed.
^ Disabling the pumps(s) is optional. Does not diable heat.
CGM I/O Sequence
Check that Heartbeat is toggling ON and OFF at 1Hz.
Check that System Active bit is ON.
If System Active bit is OFF, Turn ON System Enable bit.
Check that Automation Control Ready bit is ON. Note: Active only when there are no active
alarms, the system is enabled and the system is in REMOTE mode.
If Automation Control Ready bit is ON, Turn ON PLC Lockout bit.
Check that PLC Lockout bit is ON.
If PLC Lockout/Control bit is ON, Enter desired Style Number (16bit integer).
Dispense 1
Dispense 2,3...
Integration
Post Job Cycle
69

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-flo iq dispense system

Table of Contents