Device Control; Heater Control; Chiller Control - Rehau NEA SMART 2.0 Service Manual

Hide thumbs Also See for NEA SMART 2.0:
Table of Contents

Advertisement

9.5

Device control

9.5.1

Heater control

To find in App:
Home  More  Settings  Installer  Device  Heating Unit
Key
Text in parameter menu Comment
DH1
Minimum demand time
heating device
HE2
Position of mixing valve for
heating demand
HE3
Hysteresis of mixing valve
position for heating
demand signal
DH4
Delay time heater demand
signal
DH5
Heater blocking time
before restart
Tab. 9-7 Parameter heater control
9.5.2

Chiller control

To find in App:
Home  More  Settings  Installer  Device  Cooling Unit
Key
Text in parameter menu Comment
DC1
Minimum demand time for
chiller
DC2
Position of mixing valve for
cooling demand
DC3
Hysteresis of mixing valve
position for cooling
demand signal
DC4
Delay time for chiller
demand signal
DC5
Chiller blocking time
before restart
Tab. 9-8 Parameter chiller control
Minimum time the heating device gets started for in
minutes
The opening of mixing valve of mixed circuit has to
exceed this value before the heating device is deman-
ded. See also HE3
Symmetric hysteresis layed around the value HE2 for
start and stop of demand signal
Pause time before demand signal for heating device
After end of operation of heating device the next de-
mand signal will be soonest after this delay time
Minimum duration for the chiller demand signal
The opening of mixing valve of mixed circuit has to
exceed this value before the chiller is demanded.
See also DC3
Symmetric hysteresis layed around the value DC2 for
start and stop of demand signal
Pause time before demand signal for chiller
After end of operation of chiller the next demand sig-
nal will be soonest after this delay time
Min
Max
Base
value
0
20
3
0
100
50
0
25
5
0
10
1
0
15
3
Min
Max
Base
value
0
20
3
0
100
50
0
25
5
0
10
1
0
15
3
Unit
min
%
K
min
min
Unit
min
%
K
min
min
99

Advertisement

Table of Contents
loading

Table of Contents