Lattice extension
Table of Contents

Advertisement

Heavy load lattice extension
6.2 Rigging the heavy load lattice extension
Anemometer
G
6 - 14
On the right side
If no hook block is reeved on the main boom, the bridging plug must be
plugged into the socket that is not used;
truck crane.
Installation and removal
You must install the anemometer on the main boom for operation with the
heavy load lattice extension. You must remove the anemometer for driving
on-road.
It is installed and removed in the same way as for operation with the main
à
Operating instructions of the truck crane.
boom;
Risk of damage to the anemometer
Remove the anemometer for on-road driving.
This prevents the anemometer from being damaged by wind (e.g. by suc-
tion currents caused by oncoming traffic in tunnels).
On the left side
Remove the plug (6) from the socket (1).
Wind the connecting cable of the plug (6)
onto the holder (5).
Remove the plug (3) from the dummy socket
(2) and plug it into the socket (1).
Pull the plug of the lifting limit switch from
the socket (7).
Cover the socket (7) with the protective cap.
3 112 441 en
à
Operating instructions of the
Lattice extension operating instructions
GMK 4100/4100-L/5095

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GROVE GMK 4100 and is the answer not in the manual?

This manual is also suitable for:

Grove gmk 4100-lGrove gmk 5095

Table of Contents

Save PDF