Mains 3-Phase Voltage Supervision; Vector Jumping Monitoring - Deif MPC-1 Programming Manual

Multi power controller
Table of Contents

Advertisement

Underfreq.
0.06s
Delay =
0.1s

3.7 Mains 3-phase voltage supervision

In parallel with mains, this function is essential. Should a mains failure occur, the
parallel running generator must be disconnected from the mains. Dependent on the
modes chosen, the genset will be switched into idle run or emergency power run.
SETTING DIS-
Factory
PLAY
set
Mains voltage
ON
Supervision
ON
Mains. over-
430V
volt.
U >
440 V
Mains overvolt.
0.06s
Delay= 0.1 s
Mains under-
360V
volt.
U < 380 V
Mains
0.06s
undervolt.
Delay =
0.1s

3.8 Vector jumping monitoring

SETTING DIS-
Facto-
PLAY
ry set
Vector jump
ON
Monitoring
ON
Page 20 of 35 Tlf. (+45) 9614 9614 · Fax:(+45) 9752 4720 · E-mail: deif@deif.com
F3:
Mains
under-
volt.
Commis-
ALARM
sioning
MES-
SAGE
value
F3:
Mains
Over-
volt.
F3:
Mains
under-
volt.
Commis-
ALARM
sioning
MES-
value
SAGE
0...9.9 s. Underfrequency trip
delay. After timer runout, the GCB
(MCB if option A is chosen) is
tripped.
DESCRIPTION
ON/OFF. Select mains frequency
supervision ON/OFF.
300...480 V (75...135V using volta-
ge transformers). Overvoltage set-
point.
0...9.9 s. Over voltage trip delay.
After timer runout, the GCB (MCB if
option A is chosen) is tripped.
300...480 V (75...135V using volta-
ge transformers). Undervoltage
setpoint.
0...9.9 s. Undervoltage trip delay.
After timer runout, the GCB (MCB if
option A is chosen) is tripped.
DESCRIPTION
ON/OFF. Select vector jump su-
pervision ON/OFF.