Installation Procedure Iee - Baumuller b maXX 5000 Series Instruction Handbook Manual

Add-on modules modbus/tcp mod
Hide thumbs Also See for b maXX 5000 Series:
Table of Contents

Advertisement

5.4
Installation
5.4.2

Installation procedure IEE

Depending on the desired application you now are able to connect the incremental en-
coder emulation with further system components (see
1 Make sure that the b maXX BM5000 has been switched off voltage.
2 Connect an output (e.g. X1) of the incremental encoder emulation IEE with the encod-
or
3 Connect an output (e.g. X1) of the incremental encoder emulation IEE with the encod-
4 Tighten the lock screws of the sub-D connector.
5 Install the connecting cable(s) in the switching cabinet according the standards.
28
Instruction handbook b maXX 5000 add-on module MOD
Document No.: 5.19015.01
of 90
er input of the higher-level control (see example 2 in
Pin assignment see
ZPin assignment IEE–
Cable see
ZConnecting cable IEE channels–
er input of the next b maXX drive (see example 1 in
Pin assignment see
ZPin assignment IEE–
Cable see
ZConnecting cable IEE channels–
ZFigure 5–
on page 27).
ZFigure 5–
on page 27).
on page 29,
on page 29;
ZFigure 5–
on page 27).
on page 29,
on page 29.
Baumüller Nürnberg GmbH

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bmaxx5000Bmaxx5500

Table of Contents