Cantilever Corner Work Surface, 90 Degrees, To Wall Frame - Thermo Scientific FISHER HAMILTON MAX/WALL Installation Manual

Technical wall system
Table of Contents

Advertisement

Section 4 – Installing Supporting Furniture and Casework
4.3
Cantilever Corner Work
Surface (90
Tools Required:
1/2" and 7/16" combination wrenches
Socket set with 1/2" socket
Level
Rubber mallet
Phillips head screwdriver with No.2 and 3 tips
Hardware Included:
Bag No. 830531 consisting of:
1 5/16-18 flanged nut
1 5/16-18 x 3-1/2" HHMS
1 16 gauge washer
2 20 gauge washers
2 5/16" plug buttons
Bag No. 830532 consisting of:
8 Top brackets
8 No. 10 x 1" PPHSMS
Bag No. 830502 consisting of:
4 No. 10 x 5/8" PPHSMS
Bag No. 830532 for 90
29" deep, consisting of:
2 Corner brackets
4 1/4-20 x 1/2" HHCS
4 No. 10 x 5/8" PPHSMS
Procedure:
1. Corner work surfaces are shipped knocked-
down. All wall frames must be fully
assembled before attaching work surfaces.
Wall frames must be adjusted 1-1/4"
minimum off the floor.
2. Determine the overall height from the floor
to the work surface top. Subtract 3" from
the height and mark a line on the risers at
that height. Top hook of cantilevered leg will
be inserted at this mark. Two cantilevered legs
are used at the outside ends, while a corner
top support is used at the back. Slots in the
riser are spaced at 1" intervals.
3. Insert the corner top support at the same
height as the cantilevered legs.
4. Leveler pins, located at the bottom of the can-
tilevered legs, should be screwed all the way in.
5. Attach the cantilevered legs in position by insert-
ing hooks into the frame at the marked line.
Note: Strike cantilevered legs with a rubber mallet
using a downward motion. This ensures that the legs
are securely hooked to the wall frame.
6. Level each cantilevered leg (front to back) by
adjusting the leveler pins with a 1/2" wrench.
o
) to Wall Frame
o
corner work surface,
MAX/Wall
®
Wall Frame
Corner Top
Support
Cantilever
Adjustment Nut
Riser
Cantilever
Extrusion
Leg
Figure 4-5 Attaching Corner Cantilever Frame
Technical Wall System
Wall Frames
Legs
Leveler Pin
Marked
Line
37

Advertisement

Table of Contents
loading

Table of Contents