Ceiling Connector Trim; Ledge Cap - Thermo Scientific FISHER HAMILTON MAX/WALL Installation Manual

Technical wall system
Table of Contents

Advertisement

MAX/Wall
Technical Wall System
®
Section 3 – Installing Wall Frames

3.16 Ceiling Connector Trim

Tools Required:
Phillips screwdriver
Electric drill with 7/32" and 5/32" bits
Jigsaw with metal cutting blade
Hardware Included:
8 10 x 5/8"PPHSMS
Ceiling
Extension
Figure 3-24 Ceiling Connector Trim
Procedure:
1. Trim off the bottom of the side cap to the
required height as necessary. Drill new 7/32"
diameter holes using the drop-off piece for a
pattern.
2. Place the side cap into the ceiling channel and
against the ceiling extension. Secure the side
cap at the bottom drilling 5/32" diameter pilot
holes and secure using the two screws. See
Figure 3-24.
3. Repeat at the opposite end of the wall frame.
4. Slide the crossover cap up and into the ceiling
channel. Secure it at the end to the tabs on the
side caps. See Figure 3-24 and 3-26.
32
Ceiling Channel
Side Cap
Crossover Cap
No. 10 x 5/8"
PPHMS

3.17 Ledge Cap

Tools Required:
Phillips screwdriver
Dual-Lock
Fasteners
Support
Bracket
Figure 3-25 Ledge Cap
Procedure:
1. Loosen the screws holding the intermediate rail
to the upright.
2. Slide the support bracket onto the screws and
retighten the screws.
3. Place the cap over the intermediate rail and
press the ends firmly together to engage the
dual-lock fasteners.
Top Frame Rail
Ledge Cap
Mounting Screws
Intermediate
Cross Channel

Advertisement

Table of Contents
loading

Table of Contents