Figure 2. Separate rails
1U Tool-less mount ReadyRail installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1. Face the ReadyRails flange ears facing outward. Place one rail between the left and right vertical posts. Align and seat the back flange
rail pegs in the back vertical post flange.
The center extractions show how the pegs appear in both the square and nonthreaded round holes.
2. Align and seat the front flange pegs in the holes on the front side of the vertical post.
NOTE:
Be sure that the rails click into place and are secure.
N2200-ON Series switch installation
27