N2200 Installation

Site Preparation

N2200 Series switches can be mounted in a standard 48.26 cm (19-inch) rack
or placed on a flat surface.
Make sure that the chosen installation location meets the following site
requirements:
Power — The switch is installed near an easily accessible 100–240 VAC,
50–60 Hz outlet.
Clearance — There is adequate front and rear clearance for operator
access. Allow clearance for cabling, power connections, and ventilation.
Cabling — The cabling is routed to avoid sources of electrical noise such
as radio transmitters, broadcast amplifiers, power lines, and fluorescent
lighting fixtures.
Ambient Temperature — The ambient switch operating temperature
range is 0 to 45ºC (32 to 113ºF) at a relative humidity of up to 95 percent,
non-condensing.
NOTE:
Decrease the maximum temperature by 1°C (1.8°F) per 300 m (985 ft.) above
900m (2955 ft.).
Relative Humidity — The operating relative humidity is 8% to 85%
(noncondensing) with a maximum humidity gradation of 10% per hour.
Color
Definition
Off
Locator function is not enabled.
Flashing blue
Location function is enabled.
Off
The switch is not stack master.
Solid green
The switch is master for the stack or a
standalone unit.
Switch ID within the stack.
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

N2200

Table of Contents