Flush-Mount Readyrail Installation; Center-Mount Readyrail Installation - Dell EMC PowerSwitch N2200-ON Series Installation Manual

Table of Contents

Advertisement

3. Repeat this procedure for the second rail.
To remove each rail, pull on the latch release on each flange ear and unseat each rail.

Flush-mount ReadyRail installation

NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1. Remove the latch castings from the front side of each ReadyRails assembly, item 1.
To remove the two screws from each front flange ear on the switch side of the rail and remove each latch casting, use a Torx
screwdriver. Retain the latch castings for future rack requirements. It is not necessary to remove the back flange castings.
2. Attach one rail to the front post flange with two user-supplied screws, item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied
screws, item 3.
4. Repeat this procedure for the second rail.

Center-mount ReadyRail installation

NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied
screws, item 1.
28
N2200-ON Series switch installation