One Ru Readyrails Installation - Dell EMC PowerSwitch N2200-ON Series Installation Manual

Table of Contents

Advertisement

Wall mount
ceiling mount

One RU ReadyRails installation

Install the N2200-ON Series switch using one of the following installation instructions. You can install the ReadyRails system using the 1U
tool-less square-hole method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post
flush mount, two-post center mount, or four-post threaded mount.
NOTE:
You must order the ReadyRails mounting supplies for this installation separately.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
26
N2200-ON Series switch installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents