Installation; Specifications; System Pump Stand Installation - Nordson Encore HD Powder Spray System with Prodigy Color-on-Demand Customer Product Manual

Table of Contents

Advertisement

Specifications

System Pump Stand Installation

E 2018 Nordson Corporation
WARNING: Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
Electrical
Air Input Pressure
Air Flow Requirements
Weight *
Remote Control Input
* Weight of stand with control panels, color change manifolds, and cover.
The System Pump Stand must be located as close to the powder feed
hoppers as possible, since the maximum suction tubing length is 3 meters
(9 ft, 9 inches) from the manifold inlet ports to the pump adapters on the
feed hoppers.
WARNING: The stand weighs 125 kg (275 lbs. Use approved lifting
equipment to remove the stand from the shipping pallet and move it to its
installation location.
Unbolt the stand from the shipping pallet and secure two nylon lifting straps
to the horizontal bar at the top of the stand. Secure the straps to the forks
of a forklift or a crane hook. Lift the stand off the pallet and move it to the
chosen location.
Bolt the stand securely to the floor with the lag bolts included in the
installation kit.

Installation

Section 3
Installation
100−240 V, 50/60 Hz, 275 VA max. 1 PH
6.2−7.6 bar (90−110 psi) maximum
10 CFM during purge; 4−6 CFM during
normal operation, depending on powder
flow and atomizing air settings.
125 kg (275 lbs)
24 V, 25 mA max
3-1
Part 1605396-04

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Encore HD Powder Spray System with Prodigy Color-on-Demand and is the answer not in the manual?

Table of Contents