5 Installation

5.1 OverView

Installation of a display wall starts with installation of all pedestals. When the pedestals are installed and all
columns are connected, leveled and aligned, the dark boxes are setup. Subsequently the screens are mounted.
Finally the projection unit, the illumination unit are installed. After the cabling is completed, the optical
adjustment is done. Finally the trim and shieldings are mounted.
Throughout the manual, "left" and "right" means left and right as seen from front of the display wall.
There are several kinds of screws used for setting up OV-D2 systems. The following table shows the required
torque for fixing the screws. When tightening screws, please stick to these values!
Component
Size
Selftapping screw
M6 x 29
Selftapping screw
M6x16
Torx Screw
M6 x 7
(Metric)
Kanya Connectors
Kanya-Connectors
PVS
Barco - OV-508/OV-513/OV-515– R5990099 – installation manual – revision 01– November 2007 ________________________________
ItemNo
Torque
/description
B363372 SCR
max. 6Nm
$7500 M 6 x 29
STZN
B363373 SCR
max. 3Nm
$7500 M 6 x 16
STZN
B362666 SCR
min 3Nm;
D7985TXM 6 X 7
max 6Nm
STBK
B 20-10 PVS-VERB.
20-25Nm
________________________________________________
________________________________
________________________________
5. Installation
Comment
screwed in Aluminium
Profiles 30X30 (60X30)
screwed in Aluminium
Profiles 30X30 (60X30)
screwed in Nut B358674 PF X
ACC NUT SPGM6 B32-60
Connection for Aluminium
Profiles 30X30 (60X30)
________________ 13
________________
________________