5.7 Fixation to the floor
Barco - OV-508/OV-513/OV-515– R5990099 – installation manual – revision 01– November 2007 ________________________________
When the first row has been setup, connected and
leveled, for security reason the system should be
fixed to the floor via its fixation bracket (one on the
rear side, one on the front side).
It might be necessary to remove the floor fixation
bracket in order to drill the holes in the floor.
(If necessary, remove the floor fixation bracket, drill
the holes, re-mount the floor fixation bracket).
Fix the system to the floor!
Fixation material of the floor bracket to the concrete:
1xZYKON–anchor FZA 14x40 – M10/25 (zinc-plated
steel).
In case of false floor: make sure that the anchoring
fixation is done on the concrete!
When the fixation is done, the fixation bracket has to
be secured by the security pin.
Use a drill bit size 4.9mm to drill a hole in the profile
in the position of the security pin.
Force the security pin (size 5x32mm) into the hole.
________________________________________________
________________________________
________________________________
5. Installation
Step 30
Step 31
________________ 27
________________
________________