Setup I-Learning Steps - Elsema Eclipse MCS Setup And Technical Information

Motor controller single gate with operating system eos
Hide thumbs Also See for Eclipse MCS:
Table of Contents

Advertisement

Setup i-Learning Steps:

1. The i-Learning setup can always be interrupted with the stop button or by pressing the Master
Control knob.
2. Enter Menu 11 to start i-Learning or new control cards will automatically prompt you to do the
i-Learning.
3. Look at the LCD and follow the instructions displayed.
4. Buzzer will indicate learning was successful. If there was no buzzer check all electrical wiring
including the power supply then go back to step 1.
5. If you hear the buzzer after the i-Learn, the gate or door is ready for use.
www.elsema.com
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Eclipse MCS and is the answer not in the manual?

This manual is also suitable for:

Eclipse mcs24eEclipse mcs12eEclipse mcs12e7

Table of Contents