1.

Before Operation

Procedure before Operation

1. Mount the TS series on the mounting panel, install it and carry out wiring.
For more information, refer to "Chapter 3 ".
2. Install peripheral devices, such as PLCs or temperature controllers, and carry out wiring.
For information on precautions, refer to the TS series Connection Manual separately provided.
3. Turn the TS series on.
When turning the power on for the first time:
4. Transfer the created screen data.
• When transferring screen data for the first time:
For details, refer to "Transferring Screen Data to TS Series for the First Time" (page 5-2).
• Other cases:
For information on the procedure to change screen data with another, refer to the V8 series
Operation Manual.
5. Start MONITOUCH operation. To change to the RUN mode, refer to "Main Menu Screen" (page
5-3).
When the connection with controllers has been established, the RUN screen is displayed.
* If MONITOUCH does not operate normally and shows an error message, eliminate the cause
by referring to Chapter 6 or the V8 Series Reference Manual.
1. Before Operation
Other cases:
5-1
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monitouch ts1070Monitouch ts1070iMonitouch ts1100 seriesMonitouch ts1070 seriesMonitouch ts1100Monitouch ts1100i

Table of Contents