Figure 30
Adding Cable Ties near A9 and A10 Assemblies
3. Refer to
Figure
31. Reinstall the wire cable hold down. Assure the cables lie flat.
4. Dress the coaxial cables and semi-rigid cables neatly and tie together using cable ties
(1400-0249) at the locations indicated.
Figure 31
Cables Under Cable Hold Down
Installation Note N9020-90253
Installation Procedure
43