Power-Up Procedure - ETC Cobalt Series User Manual

Table of Contents

Advertisement

Power-up Procedure

For best performance, power-up your system in the following order.
No output will be sent until the startup show file has been loaded.
Action
1. Turn on external hub(s)
or switch(es)
2. Turn on the console and
monitor(s)
3. Start the Cobalt
software
4. Choose starting Play
5. Turn on any ETCNet2
Nodes and accessories
such as Remote Focus
units
*See
Console Key - OUTPUT
NOTE
In a network with multiple Cobalt Systems online, allow the main system to
fully start-up before starting the other systems. This will ensure that your
network configures correctly.
Hardware
Feedback
Power switches
Power and/or reset
The displays will light up
switch on console and
with the Cobalt logo. The
monitors.
screens will load the login
screen.
You can select start option
[MODIFY]
with mouse or console keys
(trackball or arrow keys).
A popup will give the choice
[MODIFY] or [ESC]
of the last play (or recovery)
or a new play. See New.
Power switches
You should be able to
control the outputs now*
115
Cobalt 8.1 - 20181029

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cobalt 20Cobalt 10

Table of Contents