Mitsubishi 800 Series User Manual page 95

Graphic operation terminal
Hide thumbs Also See for 800 Series:
Table of Contents

Advertisement

6. Procedures to Prepare for Starting Operation
MLSEC GOT
6. Proceclums
t o Prepam
EOP
-g
Operation
Refer to Section 3.2
and
Section 4.2
Turn on the GOT power supply.
I
Install into the GOT the OS program installed in
the personal computer.
3
Install the ROM-BIOS. The ROM-BIOS is
installed at the time of shipment. The
ROM-BIOS only needs to be installed if the
version of the ROM-BIOS installed in the GOT
is older than the version of ROM-BIOS
installed in the personal computer.
of the ROM-BIOS is completed.
expanded function OS, and optional OS in the
GOT.
@ When installation is completed reset the GOT
@
Reset the GOT power supply when installation
0
Install the basic OS, communication driver,
power supply.
1
Connect the module installation and
communication cables to the GOT.
@
Install the communication module and optional
@
Set the communication module switches.
@ I
Connect the connectors that will be used
to
connect the communications cable and
optional functions cable to the GOT.
@
Turn
on
the power supply of the system
connect to
the
GOT.
module
to
the GOT.
I
Refer
to
the
SWPNIW-A8GOTP
.
Operating Manual
(Data Transmission/
DebugginglDocurnent
Creation Manual)
Refer
to
Chapter
5
1
Refer
to
the
I
Download the screen data created
SWPNIW-ABGOTP
by the personal computer.
.
.
.
.
.
.
.
.
Operating Manual
(Data Transmission/
Debugging/Document
Creation
Manual)
The monitor is started
when the download is completed.
6 - 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A870got

Table of Contents