9. Installation
MELSEC GOT
Attachment
procedure
(a) Insert the front of the main module first.
(b) The module is attached at six places on the top and bottom of the GOT, as shown
below.
FOP)
(Bottom)
Attachment p o s i t i s
Attachment
positions
(c) Attach the attachment fittings as shown below.
The tightening torque should be in the range of 62 to 83.5 N-cm (7 to 8 kgcm).
Slip in the fastener in the direction shown
in @ and then fasten the fastener in the
order of @ then @, and then fasten the
Danel with screws.