Installation Guide for RFU-D-HP
4– M8x25 Screw
Required Tools
•
Metric offset wrench key wrench set
•
Metric Allen key set
Required Torque
•
M5 screws (with radio) – 5.5 Nm
•
M8 screws (with OCU) – 20 Nm
Configuration Options for OCU Kit Assembly
Attach the OCU rail to the OCU body, using the 4 M8 X 25 screws, helical washers, and flat washers, provided with the
OCU kit.
The rail can be oriented in either of the two ways shown in Figure 1 and Figure 2:
•
With the nose of the rail protruding to the left when facing the inside of the OCU (Figure 35).
5 - M8x30 Screw
6– Washers, Plain
8 – Branching Pole Profile
Page 132 of 179
7 - Washers, Helical
spring lock