Z9264F-On Switch Installation; Unpack - Dell EMC Z9264F-ON Setup Manual

Hide thumbs Also See for Z9264F-ON:
Table of Contents

Advertisement

Z9264F-ON switch installation

To install the Z9264F-ON switch, complete the installation procedures in the order
presented in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any
field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-
preventive wrist or heel ground strap when handling the switch and its components.
As with all electrical devices of this type, take all the necessary safety precautions
to prevent injury when installing this switch.
Topics:

Unpack

Four-post rack assembly
Four-post rack mount
Ground cable
Optics installation
Switch power-up
After switch installation
Unpack
NOTE:
Before unpacking the switch, inspect the container and immediately report
any evidence of damage.
When unpacking the Z9264F-ON switch, make sure that the following items are included:
One Z9264F-ON switch
One RJ-45 to DB-9 female cable
10
Z9264F-ON switch installation
3

Advertisement

Table of Contents
loading

Table of Contents