To install the Z9264F-ON switch, complete the installation procedures in the order presented in this chapter.
Always handle the switch and components with care. Avoid dropping the switch or its field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the Z9264F-ON switch and components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
Topics:
•
Unpack
•
Ground lug assembly
•
Four-post rack assembly
•
Four-post rack mount
•
2RU front-rack installation
•
Optics installation
•
Switch start-up
•
Switch replacement
•
After switch placement
Unpack
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the switch, ensure that the following items are included:
•
One Z9264F-ON switch
•
One RJ-45 to DB-9 female cable
•
Two sets of rail kits, no tools required
•
Two PSUs
•
Four fan units
•
Two AC power cables, country or region specific
•
Z9264F-ON Setup Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
Unpacking steps
Unpack the switch carefully.
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
Z9264F-ON switch installation
Z9264F-ON switch installation
5