Executing Ipl In Program Load Frame: Detail-1 - Fujitsu BS2000 SE Series Operating Manual

Server unit /390
Hide thumbs Also See for BS2000 SE Series:
Table of Contents

Advertisement

Examples of SVP operation
Store parameters
Click on [PF12]
Ê
The values entered are saved and thus made known to the SVP. These settings are
accessed for each IPL.

4.5.5 Executing IPL in PROGRAM LOAD FRAME: DETAIL-1

The IPL can be executed manually according to the setting using PROGRAM LOAD
FRAME DETAIL-1.
The following are specified in the example below:
loading VM2000
dialog startup
IPL device is specified manually by the entry of the unit address
(here: loading the VM2000 from a device with the unit address A108)
Requirement
You are in the AUXILIARY FRAME: LOAD PRESET2 screen.
Invoke the PROGRAM LOAD FRAME: DETAIL-1 screen
Click on [ModSel] to return to the MODE SELECTION FRAME.
Ê
Enter the frame code
Ê
Or enter the
i
62
and press the [ENTER] key.
LD
command in line 24 and press the [ENTER] key.
FR LD
After entering
or
LD
FR LD
INITIAL FRAME setting in the AUXILIARY FRAME: LOAD PRESET1 screen
(see
page
60) one of the following screens is displayed:
PROGRAM LOAD FRAME: DETAIL-1 screen
PROGRAM LOAD FRAME: BASIC screen
in the MODE SELECTION FRAME, depending on the
Operating the service processor
U41859-J-Z126-2-76

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se300bSe700bSe700Se500Se300Se500b

Table of Contents