Huawei UPS5000-E Series User Manual page 75

50 kva power modules
Hide thumbs Also See for UPS5000-E Series:
Table of Contents

Advertisement

UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
Figure 3-14 Antiseismic kit mounting hole positions (unit: mm)
Step 2 Drill holes for installing expansion bolts, and install expansion bolts.
Step 3 Secure two antiseismic kits to the front and rear of the cabinet:
Issue 11 (2019-12-20)
(With a marking-off template) use twelve M5x16 and four M12 screws.
Figure 3-15 Securing the antiseismic kits to the cabinet (with a marking-off template)
(Without a marking-off template) use eight M6x20 and four M12 screws.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents