Huawei UPS5000-E Series User Manual page 71

50 kva power modules
Hide thumbs Also See for UPS5000-E Series:
Table of Contents

Advertisement

UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
Ensure the expansion tube of the expansion bolts fits completely into the hole. The expansion
sleeves must be completely buried under the ground to properly facilitate subsequent
installation.
Figure 3-9 Installing expansion bolts (unit: mm)
1.
2.
3.
4.
Step 3 Move the cabinet over its castors to the installation position.
Step 4 (Optional) If the castors of the UPS need to be lifted from the ground, perform steps
Step 2
Step 5 Remove the rear panel of the cabinet, and then open the front door.
Issue 11 (2019-12-20)
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to 60 mm.
Partially tighten the expansion bolt and vertically insert it into the hole. Hit the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
in
Unsecured
Installation.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
Step 1
to
61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents