Installation Procedures - Fuel Oil Truck Application; Liquid Controls/Total Control Systems Flow Meter Installation; Installation Procedure - Veeder-Root EMR3 Installation Manual

Table of Contents

Advertisement

EMR3 Truck Installation

Installation Procedures - Fuel Oil Truck Application

Follow the installation procedures below for your particular EMR

LIQUID CONTROLS/TOTAL CONTROL SYSTEMS FLOW METER INSTALLATION

Table 1 lists the parts included in the EMR

INSTALLATION PROCEDURE

1. Remove and put aside the four mounting bolts holding the meter register assembly to the meter adaptor
mounting flange. Remove the existing mechanical register. Put the bolts aside.
2. Remove adjuster dust cover plate from front of meter (Figure 2). Remove existing adjuster and coupling shaft.
Notice the type of vertical drive shaft in the meter (Figure 3).
If vertical drive shaft has a hex with pins protruding on opposite sides, slide open end of the kit's short drive
shaft (P/N
328907-001)
. Lower Display Head onto meter, guiding the encoder shaft assembly into meter, then insert the long (P/N
001)
or short (P/N
331413-002)
If vertical drive is hexagon style, slide the kit's o-ring (P/N
past the shaft's through-hole. Slide the end of the hex shaft (P/N
the encoder shaft and secure with groove pin from kit (P/N
shaft until it seats in the end of the hex shaft. Lower Display Head onto meter, guiding the encoder shaft as-
sembly into meter. As you lower the Display Head, guide the bottom end of the hex coupling over the vertical
drive shaft of the meter.
3. Replace the adjuster dust cover plate on the front of the meter. Rotate the Display Head on the meter adaptor
mounting flange until the display is facing in the desired direction and check to see that the four meter adaptor
flange mounting holes align with four of the eight tapped (1/4 - 28 UNF-2B threads) mounting holes in the
base of the Display Head's housing. You may have to rotate the Display Head right or left a little to line up the
four holes. Replace the four mounting bolts and tighten them securely.
4. If you have the optional temperature probe, remove the existing temperature probe with the mechanical
register and replace it with the Display Head temperature probe.
3
approved adaptor kit.
Table 1.- Display Head-to-Liquid Controls Adaptor Kit 846000-006
Item
Wire - Sealing 24" (610 mm) LG
Shaft - Drive Short L.C.
Groove Pin - 0.063 D x 0.375
Coupling - Double End Short
Coupling - Double End Long
Sleeve - Hex Coupling Shaft
O-ring -.145" x .070" W
over the Display Head's encoder shaft and secure with kit's groove pin (P/N
shaft as required over the pins on the meter's drive shaft.
331413-001)
Installation Procedures - Fuel Oil Truck Application
3
approved Flow Meter Installation.
Qty
V-R P/N
1
011853-285
1
328907-001
1
510162-001
1
331413-001
1
331413-002
1
331955-001
1
512700-242
over the end of the encoder shaft just
512700-242)
331955-001)
. Slide the o-ring down the encoder
510162-001)
6
510162-
with the small through-hole over

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EMR3 and is the answer not in the manual?

Table of Contents