Handpiece Connection; System Power Up; Heater Burn In - Pace ST 115 Operation & Maintenance Manual

Table of Contents

Advertisement

Set-Up
4. Additional fittings may also be added to the hose connection at the rear of
each air handpiece to ease changing of handpieces.
When removing any air hose, turn and pull. Do not attempt to pull hose directly off.
Damage to or breakage of fitting or VisiFilter may occur. Use your Sodr-X-Tractor with
a clean VisiFilter element. Otherwise a deterioration in performance or damage to the
unit may occur.

Handpiece Connection

Connect the handpiece connector plug into the
Power Receptacle in the following manner.
1. Align guide on connector with slot on
power receptacle.
2. Insert connector into power receptacle.
3. Turn the connector housing clockwise
to lock in place.

System Power Up

1. Insert the female end of the power cord into the AC Power Receptacle at
the rear panel of the power source.
2. Plug the prong end (male end) of the power cord into a 3 wire grounded
AC supply receptacle. The system is now ready for operation.
To insure operator safety, the AC supply receptacle must be checked for proper
grounding before initial operation.
3. Read this manual and all other included manuals thoroughly before
operating the system.

Heater Burn In

To ensure optimum performance and long life, new TJ-70 handpieces must undergo a
burn in procedure. A Red tag is attached to each handpiece and with replacement
heater assemblies which describes the proper procedure. The ST 115 system
however, has a Burn In feature which, when activated will burn in the TJ-70 heater in
a similar manner as is described on the tag. Use this feature when setting up a new
ST 115 system or when replacing a TJ-70 handpiece heater assembly.
Ensure that the system is placed in a well-ventilated area. Smoke will be emitted from
the heater assembly during the burn in cycle.
14
NOTE
CAUTION
NOTE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents