Handpiece Connection; Air Hose Routing; System Power Up - Pace 20A Operation & Maintenance Manual

Table of Contents

Advertisement

Handpiece Connection

Connect the handpiece (or PS 50) connector plug into the Power Receptacle in the
following manner.
1. Turn the Locking Ring fully
counterclockwise with the Connector
Key end facing the power source.
2. Align the Connector Key with the
Receptacle Keyway.
3. Insert the connector into the power
receptacle.
4. Turn the Locking Ring fully clockwise
to secure in place.

Air Hose Routing

When using an Air Handpiece (e.g., SX-70
Sodr-X-Tractor) or a Tip-Evac Fume Extraction
System, any associated air hose(s) can be routed
through the 2 Air Hose Feed Thru holes located
on the bottom of the power source.

System Power Up

1. Insert the female end of the power cord into the AC Power Receptacle at
the rear panel of the power source.
2. Plug the prong end (male end) of the power cord into a 3 wire grounded
AC supply receptacle. The system is now ready for operation.
To insure operator safety, the AC supply receptacle must be checked for
proper grounding before initial operation.
3. Read the "Operation" section of this manual thoroughly before operating
the system. Included is a description of Sodr-Pen operation. Shipped
with ST 20A-TT and ST 20A-PS systems is an additional Operation &
Maintenance manual which details operation of the TT-65 ThermoTweez
handpiece or PS-50 Prep-Set.
CAUTION
Set-Up
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

St 20a seriesSt 20a-spSt 20a-ttSt 20a-ps

Table of Contents