Starting The Test Routine; Stopping The Test Routine - Festo Compact Performance CP-FB6-E Manual

Hide thumbs Also See for Compact Performance CP-FB6-E:
Table of Contents

Advertisement

3. Diagnosis

Starting the test routine

1. Switch off the operating voltages (pins 1 and 2) at
2. Switch off the operating voltages at the output
3. Remove the DIL switch cover.
4. Note the settings of the DIL switch.
5. Set DIL switch element 1 to OFF.
6. Switch on the operating voltages (pins 1 and 2).
7. Set DIL switch element 1 to ON within 5 seconds.
If the 5 second interval is exceeded, the CP valve ter-
minal/CP system will resume normal operation.
Then switch on the operating voltage at the output
modules again.

Stopping the test routine

1. Switch off the operating voltages (pins 1 and 2) of
As DIL switch element 1 is set to ON = Test routine off
the CP system will start again when the power is
switched on without the test routine.
CP FB6-E 9809c
the node.
modules.
the terminal.
3-9

Advertisement

Table of Contents
loading

Table of Contents