INSTALL THE ROOF PANELS
The roof panels are installed and secured in the same
manner as the previous panels.
The length of the greenhouse determines the quantity of
each required panel. Roof panels consist of the following:
Long, rectangular panels: Panel E
Short, rectangular panels: Panel F – These panel are
installed in the space below each roof vent.
ATTENTION: Remember to install all panels with the
UV-protected surface to the outside.
X
F
Photo shows the roof vent with the installed panel (Panel
X) and the adjacent, lower roof panel (Panel F). The
dashed line shows the location of the U-strip.
NOTE: As before, the retention clips are installed along the
sides of the panels.
Diagram shows a roof panel (E) and the sidewall panel (D).
After installing all panels, install the drain pipes.
Revision date: 01.01.16
Single-Bay Roof Vent
D
GROWSPAN
ESTATE ELITE ATTACHED GREENHOUSES
INSTALL THE DRAIN PIPES
Consult the following table to locate the parts.
Greenhouse Sku Number
104711 – 104713 – 104715
1. Locate the plastic drain pipe clamps (85) and the drain
pipes (86) for the gutter.
2. Move to one corner, position the bracket as shown,
mark the location, and drill the hole through the end
wall frame member (if needed).
NOTE: Use
two (2) plastic
brackets for each
drain pipe.
For best results,
space the
brackets evenly.
3. Attach the plastic clamps to the end wall lower support
using bolts, or use silicone to secure the clamp. Arrow
shows where to install bolt for the clamp if bolts are
used.
For drain pipes, use box:
No. 4-2
End Wall
Support
NOTE:
Some
brackets
may not
require
drilling.