Chapter 4: Preparing Other Integrated Devices; Overview; Dimensions For Integrated Devices; System Layout Dimension Changes - Beckman Coulter Biomek NXP Preinstallation Manual

Laboratory automation workstation
Hide thumbs Also See for Biomek NXP:
Table of Contents

Advertisement

Overview

This section details the necessary workspace and electrical supply and power quality required for a
P
Biomek NX
Laboratory Automation Workstation integrated with other devices.
Preparing the site for other devices includes:
• determining adequate space is set aside for devices integrated to the Biomek NX
(see
Dimensions for Integrated
• electrical supply and power are adequate for operation (see
Requirements).

Dimensions for Integrated Devices

Use
Figure 4.1
optional integrated devices.
Leave a minimum of 2 feet behind the Biomek NX
for instrument access.
NOTE
A Biomek NX
a Biomek Assay Workstation controlled through SAMI Workstation EX software.
Figure 4.1 System Layout Dimension Changes
B20063AC
Preparing Other Integrated Devices
Devices).
and
Figure 4.2
to determine adequate space for the Cytomat device and any other
P
instrument with integrated devices may be controlled through Biomek Software or as
Electrical Component
P
instrument for service access and 2 feet in front
CHAPTER 4
P
instrument
4-1

Advertisement

Table of Contents
loading

Table of Contents