Commissioning

8

8.1 Inspection before Commissioning

N N o o . .
I I n n s s p p e e c c t t i i o o n n i i t t e e m m
1
All cables are intact, well-insulated, and appropriately dimensioned.
2
All cables are connected correctly and firmly.
3
The polarity of the power supply cable is correct. The grounding cable is
reliably grounded.

8.2 Commissioning Steps

Commission the Logger3000 only after all the foregoing items meet requirements.
Commissioning steps are as follows:
S S t t e e p p
N N o o . .
1
Power on the Logger3000.
2
Check whether the RUN indicator of Logger3000 is normal state.
Enter the IP address, such as 192.168.1.100, of the Logger3000 in the PC
3
address bar.
4
Configure serial port parameters on the WEB interface.
Add the PV devices connected to the Logger3000 to the WEB interface by
5
means of searching or manual adding.
6
Configure IP address.
Configure the address of iSolarCloud if running data needs to be uploaded to
iSolarCloud.
If the Logger3000 is used in mainland China, it is unnecessary to configure the
7
address.
If the Logger3000 is used in regions other than mainland China, set the
address to api.isolarcloud.com.hk and the port to 19999.
Check whether running data of SUNGROW inverter is correct via the WEB
8
interface.
Check whether the forwarding data is correct via the background monitoring
9
system.
Create new plant through the iSolarCloud APP and check whether the platform
10
data is correct.
33

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Logger3000 and is the answer not in the manual?

Table of Contents

Save PDF