Step 2 Set Baud Rate, Comm Address, and Enable Monitoring Resistor based on site
requirements.
Table 4-5 Communication settings
Item
Baud Rate
Comm Address
Enable Monitoring Resistor
----End

4.6 Commissioning Procedure

Context
Issue 05 (2019-12-20)
Remove the refrigerant steel cylinder after confirming that sufficient refrigerant has been
injected.
If no electric heater or humidifier is configured, skip the commissioning procedures for
such components.
Copyright © Huawei Technologies Co., Ltd.
Description
Set the baud rate as
required. The value should
be consistent with that set
on the EMS.
The communications
addresses of smart cooling
products controlled by one
element management system
(EMS) must be different.
The communications
addresses are independent of
cable routing addresses and
teamwork addresses.
In an EMS, the values for
the first and last smart
cooling products by cable
routing are "Yes".
4 Power-On Commissioning
Default valve
9600
1
No