Festo CPV Series Manual page 31

Compact performance cpv valve terminal with direct link
Hide thumbs Also See for CPV Series:
Table of Contents

Advertisement

1. Installation
SLC scanner
SLC scanner from Allen-Bradley
SF 60 from Festo with integrated SLC scanner
Pin 2 +24V Bus
Pin 4 Data+
Pin 1 Screening
Pin 5 Data-
Fig. 1/12: Connections for the DeviceNet
1-22
Connecting instructions for Allen-Bradley DeviceNet
PLEASE NOTE
Always check the pin assignment of your scanner
according to the relevant documentation.
Connect the field bus cable of your control system to
the field bus interface of the valve terminal as follows.
The diagram below shows the connections for the SLC
scanner and the SF 60 valve terminals (integrated SLC
scanner):
RED
WHITE
BARE
BLUE
BLACK
Pin 3 GND Bus
CP valve terminal with direct
connection for the Allen-Bradley
DeviceNet
Pin 2 +24V Bus
Pin 4 Data+
Pin 1 Screening
Pin 5 Data-
Pin 3 GND Bus
Pin 2 +24V Bus
Pin 4 Data+
Pin 1 Screening
Pin 5 Data-
Pin 3 GND Bus
CP-DN8 9806NH

Advertisement

Table of Contents
loading

Table of Contents