Festo CPV Series Manual page 19

Compact performance cpv valve terminal with direct link
Hide thumbs Also See for CPV Series:
Table of Contents

Advertisement

1. Installation
Bus length
Load voltage
cable
1-10
The following table shows the guide values for the
maximum distance depending on the baud rate se-
lected. Exact details can be found in the manuals for
your control system and scanner.
Baud rate
125 kBaud
250 kBaud
500 kBaud
• Use a load voltage cable with sufficient diameter.
• Avoid long distances between the power unit and the
CPV valve terminal.
Long load voltage cables reduce the voltage supplied
by the power unit.
• If necessary, ascertain the suitable cable diameter
and the maximum permitted cable length.
Maximum
trunk bus
length
Maximum
500 m
250 m
100 m
Branch cable length
cumulative
156 m
6 m
78 m
39 m
CP-DN8 9806NH

Advertisement

Table of Contents
loading

Table of Contents