Festo CPV Series Manual page 21

Compact performance cpv valve terminal with direct link
Hide thumbs Also See for CPV Series:
Table of Contents

Advertisement

1. Installation
Preparing
1-12
When you have selected suitable cables, connect them
as follows:
1. Loosen the centre knurled nut in order to open the
socket.
1
2
3
1
2
Cable
Housing
Fig. 1/6: Preparing the connecting cable
2. Open the strain relief in the rear of the housing.
Pass the cable through as follows.
3. Remove 5 mm of the insulation on the ends of the
cables and fit end sleeves to the wire strands.
4. Connect the ends of the conductor cables.
5. Place the connecting part on the node housing
again. Pull the cable back so that there are no loops
inside the housing.
6. Tighten the strain relief.
4
3
4
Connecting part
Strain relief
CP-DN8 9806NH

Advertisement

Table of Contents
loading

Table of Contents