Installation - TE Connectivity AT-SC Operating Instructions Manual

Pneum. parallel crimp machine
Table of Contents

Advertisement

Available languages

Available languages

528050-1
7.2

Installation

INFORMATION:
To reduce production noise or vibration the machine can be placed on an insulating
rubber mat.
ATTENTION!
 Position the Pneum. Parallel Crimp Machine AT-SC on a flat surface and assure the
stability of the machine. Ensure that the table or bench is stable enough to support
the machine in normal use.
 Assure an appropriate table height. The table height is depending on the position of
the operator (work in sitting or standing position) according to prEN 894-4:2004,
Table A.1.
 The crimping machine does not have its own light source. Assure an appropriate
illumination of the working place. (EN 1837:1999 – chapter 4.2: "The general value
of illumination has to be 500 lx [...]")
Place the double foot petal on the floor. No other place is allowed.
INFORMATION:
When the operator is positioned in the front of the machine the pedal should be placed
in a comfortable position. The pedal should be placed on an anti slip rubber mat. The
double foot pedal must be movable, so that the operator has the possibility to change
his position for ergonomic and production needs.
ATTENTION!
 Place the tubes on the floor so that they do not cause a trip hazard.
 Do not lay the double foot pedal in aisles or walk ways.
 Assure free access to the operating elements of the machine, especially the double
foot pedal and the release button.
 During transport and installation of the machine wear suitable safety shoes.
Page 46 / 101
412-18876 Rev. G
ECOC: EGC0 ; LOC: AI

Advertisement

Table of Contents
loading

This manual is also suitable for:

528050-1

Table of Contents