Figure 12. Version 1 Internal Cover - Eaton 9355 Series User Manual

Parallel ups 10/15 kva
Table of Contents

Advertisement

Figure 12. Version 1 Internal Cover

7.
Punch holes for the conduit (AC input, UPS output, load connection, and maintenance bypass contact
wires) using a Greenlee
8.
Verify that the parallel bypass breaker is in the OFF position (see
9.
Mount the parallel tie cabinet to the wall and install the conduit.
Figure 13. Version 1 Parallel Bypass Breaker
10. Verify that each UPS battery circuit breaker is in the OFF position (see
11. From each UPS, remove the UPS wiring access cover and one of the conduit landing plates and retain.
Internal
Cover
®
punch or similar device.
Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0
UPS System Installation
Figure
13).
Figure
14).
21