Figure 9. Unloading the Cabinet

11. With the cabinet supported, slowly pull the pallet away from the cabinet (see
Figure 10. Removing the Pallet
12. Roll the cabinet to the desired location.
4 4 . . 3 3
E E x x t t e e r r n n a a l l A A C C P P o o w w e e r r W W i i r r i i n n g g I I n n s s t t a a l l l l a a t t i i o o n n
You are now ready to install the Eaton 9355 UPS. Select one of the following installation options according to
your UPS configuration:
To install the Version 1 Tie Cabinet, see paragraph
To install the Version 2 Tie Cabinet, see paragraph
4 4 . . 3 3 . . 1 1 V V e e r r s s i i o o n n 1 1 T T i i e e C C a a b b i i n n e e t t P P a a r r a a l l l l e e l l I I n n s s t t a a l l l l a a t t i i o o n n
The Eaton 9355 UPS has the following power connections:
3–phase (L1, L2, and L3), neutral, and ground connection for rectifier/bypass input
3–phase (L1, L2, and L3), neutral, and ground connection for load output
4.3.1 Version 1 Tie Cabinet Parallel
4.3.2 Version 2 Tie Cabinet Parallel
Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0