Figure 21. Version 2 Parallel Tie Cabinet Internal Cover - Eaton 9355 Series User Manual

Parallel ups 10/15 kva
Table of Contents

Advertisement

UPS System Installation

Figure 21. Version 2 Parallel Tie Cabinet Internal Cover

8.
Punch holes for the conduit (AC input, UPS output, load connection, and maintenance bypass contact
wires) using a Greenlee
9.
Verify that the parallel bypass breaker is in the OFF position (see
10. Mount the parallel tie cabinet to the wall and install the conduit.
28
Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0
Internal
Cover
punch or similar device.
®
Figure
22).