Figure 17. Version 1 Load Connections - Eaton 9355 Series User Manual

Parallel ups 10/15 kva
Table of Contents

Advertisement

UPS System Installation
17. Replace the UPS wiring access cover and conduit landing plate.
18. Repeat

Figure 17. Version 1 Load Connections

19. Wire the AC input to the bypass breaker (see
24
Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0
Step 12
through
Step 17
for each UPS.
Maintenance Bypass
Wiring to UPS TB2
Ground
Line 1
Neutral
Line 2
Line 3
Figure
18).