Figure 25. Version 2 Tie Cabinet Ups Output To Parallel Tie Wiring - Eaton 9355 Series User Manual

Parallel ups 10/15 kva
Table of Contents

Advertisement

UPS System Installation

Figure 25. Version 2 Tie Cabinet UPS Output to Parallel Tie Wiring

Line 1
Line 2
Line 3
16. Hardwire the load to the parallel tie cabinet (see
17. Wire the maintenance bypass contacts and terminate to the maintenance bypass wires in the parallel tie
cabinet (see
Connect the black and the red wires from the terminal block on the Tie Cabinet to TB2 on the UPS.
NOTE
18. Replace the UPS wiring access cover and conduit landing plate.
19. Repeat
32
Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0
Ground
Figure
24).
The maintenance bypass contacts are normally-open. To ensure proper bypass
operation, DO NOT use the blue wire (it is normally-closed).
Step 13
through
Step 18
for each UPS.
Neutral
Figure
26).
Line 1
Line 2
Line 3