Installation should be performed only by qualified personnel.
Refer to the following while installing the UPS system:
Review Chapter 3 UPS Installation Plan and Unpacking, for cabinet dimensions, equipment weight,
wiring and terminal data, and installation notes.
Do not tilt the cabinets more than ±10° during installation.
Remove conduit landing plates to add conduit landing holes as required.
If perforated floor tiles are required for ventilation, place them in front of the UPS.
4 4 . . 2 2
U U n n l l o o a a d d i i n n g g t t h h e e U U P P S S C C a a b b i i n n e e t t f f r r o o m m t t h h e e P P a a l l l l e e t t
The following tools are required for unloading the cabinet(s):
15 mm wrench or socket
7 mm nut driver or socket
The UPS and EBM are heavy (see
remove the cabinets from the pallet.
To unload three-high cabinets or two-high EBMs, proceed to paragraph
4.2.1 Three-High Cabinets or Two-High
4.2.2 Two-High UPS
4 4 . . 2 2 . . 1 1 T T h h r r e e e e - - H H i i g g h h C C a a b b i i n n e e t t s s o o r r T T w w o o - - H H i i g g h h E E B B M M s s
To remove a three-high cabinet or a two-high EBM from the shipping pallet:
1.
Remove the two M10 bolts securing the stabilizing bracket to the pallet (see
Table
2). Unloading the cabinets requires at least two people to safely
EBMs. To unload two-high UPS cabinets, proceed to paragraph
Cabinets.