UPS System Installation
Figure 27. Version 2 Tie Cabinet Bypass AC Input Wiring
Line 1
Line 2
Line 3
21. Verify the phase rotation for each UPS and the bypass input.
22. Reinstall the internal cover removed in
23. Reinstall the parallel tie cabinet front cover removed in
24. Proceed to paragraph
4 4 . . 3 3 . . 3 3 I I n n s s t t a a l l l l i i n n g g O O p p t t i i o o n n s s
This section describes the Powerware Hot Sync CAN Bridge Card.
For other options, such as additional X-Slot cards, LanSafe Power Management Software, remote emergency
power-off (REPO), relay output contacts, or programmable signal inputs, refer to the Eaton 9355 UPS (10/
15 kVA) User's Guide.
Figure 28
shows the location of the communication options and control terminals on the UPS.
34
Eaton 9355 Parallel UPS (10/15 kVA) User's Guide 164201601—Rev E0
Step
7.
4.3.3 Installing Options
to continue the installation process.
Step
5.