Parallel UPS System Installation
Figure 4. Unloading the Cabinet
9.
With the cabinet supported, slowly pull the pallet away from the cabinet (see
Figure 5. Removing the Pallet
10. Roll the cabinet to the desired location.
4 4 . . 3 3
P P a a r r a a l l l l e e l l I I n n s s t t a a l l l l a a t t i i o o n n
The Eaton 9155 UPS has the following power connections:
•
2–phase (L1and L2), neutral, and ground connection for rectifier/bypass input
•
2–phase (L1and L2), neutral, and ground connection for load output
The nominal input/output voltages are:
•
100/200, 110/220, or 120/240 Vac with 180° phase displacement
18
Eaton 9155 Parallel UPS (8–15 kVA) User's Guide 164201592—Rev E0
Figure
5).