Conducting The Test; Connecting The Uut; Procedure For Ac/Dc Test - Chroma 19020 User Manual

Multi-channel sync hipot tester
Hide thumbs Also See for 19020:
Table of Contents

Advertisement

4.8 Conducting the Test

4.8.1 Connecting the UUT

First ensure there is no voltage output and the DANGER LED is off. Connect the low potential
test cable (black) to the Tester RTN/LOW terminal. Short-circuit the test cable and high
voltage output terminal and ensure there is no high voltage output. Next, plug in the high
voltage test cable (red or white) to high voltage output terminal. Then connect the low
potential test cable to UUT and the high potential test cable to UUT.

4.8.2 Procedure for AC/DC Test

1.
Connect the UUT properly following the connection method.
2.
In the power on screen shown below:
Position 1
TEST – 1/2
MODE CH
01
02
03
04
05
AC
06
07
08
09
10
STANDBY
Illustration:
TEST 1/2 means there are 2 test steps and it is running the 1
indicates the test mode. "Position 1" indicates the set voltage, "Position 2" is the high limit
set for current, while "Position 3" is the test result.
3.
Press STOP to prepare for test. The status line shows "STANDBY".
4.
Press START to activate the test
When this key is pressed it starts to output voltage and the DANGER LED is on. The
status line shows a counter to count down. "Position 1" will show the output voltage value,
"Position 2" will show the current readings and "Position 3" will show the test result.
5.
GOOD Judgment
When all tests are done and the results show PASS, the Tester will see the UUT as a
GOOD product and cutoff the output. The HANDLER interface outputs PASS signal and
the beeper acts at the same time.
6.
NO GOOD Judgment
If the test value is abnormal, the Tester judges it as FAIL and cutoff the output
Position 2
SOURCE
LIMIT
0.050kV
0.500 mA
0.050kV
0.500 mA
0.050kV
0.500 mA
0.050kV
0.500 mA
0.050kV
0.500 mA
0.050kV
0.500 mA
0.050kV
0.500 mA
0.050kV
0.500 mA
0.050kV
0.500 mA
0.050kV
0.500 mA
REMOTE LOCK
Position 3
RES.
RECALL
OFFSET
GET Cs
CLEAR
SLAVE
1 2 3 4 5 6 7 8 9
CORR
ERROR
st
test step at present. AC
Operation
4-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

19020-41902119022-419021-419022

Table of Contents